What is PDSA?

    Short answer

    PDSA (Plan-Do-Study-Act) is a four-step improvement cycle for testing a change on a small scale before rolling it out. Teams plan the change and a prediction, try it, study what actually happened, then act by adopting, adapting or dropping the change. It is widely used in quality improvement and healthcare.

    Last updated · TeamAssurance

    Where does PDSA come from?

    PDSA grew out of the Shewhart cycle and was refined by W. Edwards Deming, who replaced "Check" with "Study" to stress learning from results rather than only inspecting them. It is the best-known version of the same loop as PDCA, and is the model behind the Institute for Healthcare Improvement's approach to testing changes.

    What are the four steps of PDSA?

    1. Plan. State the objective, make a prediction ("if we do X, we expect Y"), and decide what data you will collect, who does what and where the test will run.
    2. Do. Carry out the test on a small scale, such as one shift, one line or one ward. Record what happened, including problems and surprises.
    3. Study. Compare the results with your prediction. Ask what you learned and why the outcome differed, if it did.
    4. Act. Decide what to do next: adopt the change, adapt it and run another cycle, or abandon it.

    What is the difference between PDSA and PDCA?

    PDCAPDSA
    Third stepCheck the resultsStudy and learn from the results
    EmphasisConfirming the change workedTesting a prediction and building knowledge
    Common useManufacturing, lean, standard workHealthcare, services, quality improvement

    In practice the cycle is the same, and teams use the names interchangeably.

    When should you use PDSA?

    Use it when you are unsure a change will work and want to learn cheaply. Run several small cycles, each building on the last, instead of one large rollout.

    Example

    A hospital ward wanted to cut late discharge paperwork. In the first cycle, one nurse tried a checklist with five patients, predicting every form would be complete by 10am. The study showed four of five were, and the missed one lacked a pharmacy sign-off. The team adapted the checklist, tried it across a full shift in cycle two, then adopted it for the ward.

    How TeamAssurance helps

    TeamAssurance supports PDSA through its Kaizen Ideas method, which takes each idea through planning the change, trying it on a small scale, measuring results and then standardising or adjusting. Ideas and actions are tracked through tiered daily management, so each cycle has an owner and a due date, and improvement activity can be linked to strategic goals.

    Frequently asked questions

    Is PDSA the same as PDCA?

    They describe the same basic improvement cycle. PDSA uses Study in place of Check to stress learning from the result, while PDCA is more common in manufacturing and lean settings.

    How big should a PDSA test be?

    Start as small as is useful, such as one person, one shift or one patient group. Small tests are quick and low risk, and you can scale up over later cycles once the change has worked.

    What happens after the Act step?

    If you adopt the change, write it into standard work and monitor it. If you adapt it, start a new cycle with the revised plan. If you abandon it, record what you learned before choosing another idea.