The OEE formula
- Availability = run time ÷ planned production time. It is lost to breakdowns, changeovers and other stops.
- Performance = (ideal cycle time × total count) ÷ run time. It is lost to minor stops and slow cycles.
- Quality = good count ÷ total count. It is lost to defects and rework, including start-up scrap.
- OEE = availability × performance × quality.
For example, a line planned for 480 minutes that ran for 400 (availability 83%), produced 3,600 units against an ideal of 4,000 in that time (performance 90%) and had 3,420 good units (quality 95%) has an OEE of 0.83 × 0.90 × 0.95 = 71%.
The six big losses
OEE was developed within total productive maintenance to make the six big losses visible:
- Breakdowns
- Set-up and adjustment
- Minor stops and idling
- Reduced speed
- Defects and rework
- Start-up losses
Each loss maps to one of the three factors, so a falling OEE points to where the problem is.
Using OEE well
- Compare a machine with itself over time, not one machine with another. Different equipment has different ideal cycle times and planned schedules.
- Look at the three factors, not only the headline. A 70% OEE from low availability needs maintenance and changeover work; the same figure from low quality needs process control.
- Record the losses behind the numbers. OEE tells you how much time was lost; the reason codes tell you why.
- Review it daily. Yesterday's OEE and its biggest loss belong on the Tier 1 board, with chronic losses escalated into problem solving.
Common mistakes
- Chasing a benchmark figure such as "world class 85%" without understanding what is in the planned time.
- Excluding changeovers or planned maintenance to make the number look better, which hides the losses that could be reduced.
- Treating OEE as a report for management rather than a signal for the team running the machine.