Total productive maintenance (TPM) is a lean approach to equipment care in which operators, maintenance technicians and leaders share responsibility for keeping machines reliable. It rests on eight pillars built on 5S, aims for zero breakdowns, zero defects and zero accidents, and is measured with overall equipment effectiveness (OEE).
At a glance
- Meaning: total productive maintenance, in which "total" means everyone is involved and "productive" is the aim.
- Structure: eight pillars built on a foundation of 5S, including autonomous maintenance, planned maintenance and focused improvement.
- Measure: overall equipment effectiveness (OEE), which multiplies availability, performance and quality.
- Related: the short TPM definition and autonomous maintenance.
TPM at a glance
- Stands for: total productive maintenance (not "total preventive maintenance", a common misreading).
- Origin: Japan, 1960s and 1970s; formalised by Seiichi Nakajima and the Japan Institute of Plant Maintenance (JIPM).
- Who is involved: operators, maintenance technicians, engineers and leaders working as one team.
- Structure: eight pillars on a 5S foundation.
- Measure: OEE (availability × performance × quality) and the six big losses.
- Cadence: daily operator checks, planned maintenance on a schedule, losses reviewed in daily tier meetings.
This post opens a series on digitising frontline operations. It uses TPM, and the lean methods TPM draws on, as a practical example of how small and medium-sized manufacturers can now unlock benefits that were previously only available to their larger competitors.
What does TPM stand for in maintenance?
TPM stands for total productive maintenance. "Total" means everyone is involved, "productive" means the aim is production without losses, and "maintenance" means keeping equipment in the condition that delivers it. The approach grew out of lean manufacturing in Japan, and its central idea is that equipment reliability isn't only the maintenance department's job. Operators clean, inspect and lubricate their own machines and spot abnormalities early; maintainers focus on planned and preventive maintenance and on the harder technical work; and cross-functional teams of operators, maintainers, engineers and leaders work together on the losses that matter most. For the short version, see our glossary entry What is total productive maintenance?
What are the eight pillars of TPM?
TPM's eight pillars rest on a 5S foundation.
The traditional model rests on eight pillars, built on a foundation of 5S:
- Autonomous maintenance. Operators take on routine maintenance tasks such as cleaning, inspection, lubrication and tightening, written up as standard work so every shift does them the same way.
- Planned maintenance. Preventive maintenance scheduled on time, usage or condition, so failures are prevented rather than repaired.
- Focused improvement. Small cross-functional teams attack specific losses using structured problem solving.
- Quality maintenance. Keeping equipment in the condition that produces good product, so defects are prevented at the source.
- Early equipment management. Using what was learned on existing machines to design new equipment that is easier to run and maintain.
- Training and education. Building the skills operators and maintainers need for their part of TPM.
- Safety, health and environment. A safe workplace is a condition of everything else, not an add-on.
- TPM in administration. Applying the same thinking to the office processes that support production.
How is TPM measured? OEE and the six big losses
TPM is measured through overall equipment effectiveness (OEE): availability × performance × quality. Behind the number sit the six big losses:
| Loss | OEE factor | Example |
|---|---|---|
| Breakdowns | Availability | A gearbox fails mid-shift |
| Set-up and adjustment | Availability | Changeover between products |
| Minor stops | Performance | A jam cleared in under a few minutes |
| Speed losses | Performance | Running below the rated speed to avoid problems |
| Defects and rework | Quality | Product scrapped or reworked |
| Start-up losses | Quality | Rejects while the line stabilises after a start |
Speed losses are the easiest to miss. The machine is running and nobody is waiting, so it looks fine, but it is producing less than it should. Tracking actual against ideal cycle time makes them visible.
How does TPM differ from traditional maintenance?
Traditional maintenance treats equipment reliability as the maintenance department's job: operators run the machine, call maintenance when it breaks, and a preventive maintenance schedule sits with the technicians. TPM keeps the planned and preventive work but spreads the ownership. Operators carry out daily care and raise abnormalities, maintainers concentrate on the technical work, and both review the losses together. The CMMS stays; what changes is who is involved and how often the condition of the equipment is discussed. For how that plays out at operator level, read autonomous maintenance is a management system, not a checklist.
Why digitise a TPM programme?
Your competitors have already understood that digitisation unlocks the possibility for step change improvement. When thinking of your competitors, don't just think of individual companies; think of whole economies (like India) embracing digitisation.
When thinking of step change, try to visualise '10X' levels of improvement. To simplify what 'step change' means, choose a critical frontline process and roughly calculate what a 10X increase in velocity, capacity and agility would do for the organisation. This is what is available to both you – and your competitors – right now.
TPM aims for the most reliable assets, at the highest levels of safety and quality, at the lowest cost. But it is resource intensive and, by definition, a team game. It requires careful and continuous coordination so that all links in the chain are at their best. The management systems that hold the eight pillars up include:
- Tiered daily management systems
- Equipment maintenance management
- Continuous improvement frameworks
- Quality management
- Safety and environment management
- Education and training management
Applying a step change mindset to each and every one of these systems is critical in delivering the final promise. Since TPM relies on all areas improving simultaneously, it helps to take a broad look at what digitisation can deliver across all of these systems at once.
What are the benefits of digitising TPM?
10X velocity: Digitisation accelerates every process, turning the batching of information into a real-time, business-wide feed. It enables all functions involved to triage, prioritise and empower employees in their day-to-day activity, to always be working on the right thing – together as a team.
Through the emphasis on proactive 'discovery' of problems in their infancy, digitisation enables the organisation to connect its internal processes cross-functionally, rather than simply optimising one group of people to the exclusion of others.
Continuous feedback also means team members stay engaged and can see the outcomes of their discretionary efforts bearing fruit.
10X capacity: Today, every team member must be seen as a knowledge worker. But what knowledge do we mean? The answer is 'all of it': whether this is knowledge within the process, people or systems of the business, it should all be made available to whoever needs it, when and wherever it is needed.
When we view this challenge as simply a process of removing the barriers that prevent this knowledge from being available, a fresh approach may be made. Fortunately, an existing tiered daily management and learning system provides the structure to identify and eliminate these barriers as they are seen.
When each of our team members has all that they need at hand to execute best-in-class processes, connected with their adjacent functions, the power of 1+1 = 3 really does begin to make sense.
10X agility: The digital era demands flexibility. Operations digitisation allows businesses to pivot quickly, adapting to new opportunities or challenges with ease. Simply gaining visibility of each and every system, with granular real-time detail, gives all team members the opportunity to respond or adapt in an informed way.
The automatic collation of process and system performance (best suited to computers) across all levels and reporting cadences gives valuable time back to those team members for analysis, team discussion and, most importantly, decision making (best suited to humans).
Speeding up the PDCA process is one thing, but being able to accurately communicate in a timely manner to all stakeholders involved ensures that people not only know what they need to prioritise, but why they need to.
How does TeamAssurance support TPM?
TeamAssurance is a daily management platform with asset management built in. Recurring maintenance and inspection tasks, including operator checks, are scheduled automatically at daily, weekly, monthly or custom intervals, completed on mobile devices with evidence capture, and tracked on dashboards that show on-time completion and overdue items. Equipment issues raised on the floor are escalated through tiered daily management, so production and maintenance review the same losses on the same tier boards, and existing CMMS data can be connected into that daily rhythm rather than staying inside the maintenance department.
Frequently asked questions about TPM
Is TPM the same as total preventive maintenance?
No. TPM stands for total productive maintenance. Preventive maintenance is one part of it: the planned maintenance pillar, usually carried out by technicians. TPM is the wider operating system around that work, adding operator-led autonomous maintenance, focused improvement, quality maintenance, training and safety, with the goal of eliminating every equipment-related loss.
What are the pillars of TPM?
Autonomous maintenance, planned maintenance, focused improvement, quality maintenance, early equipment management, training and education, safety, health and environment, and TPM in administration. The eight pillars rest on a foundation of 5S, because a clean, ordered workplace is where abnormalities become visible early.
Which TPM pillar covers routine maintenance by operators?
Autonomous maintenance. Operators clean, inspect, lubricate and tighten their own equipment to a written standard and tag abnormalities as they find them. Planned maintenance, the second pillar, covers the scheduled technical work that maintenance technicians carry out on time, usage or condition.
How is TPM measured?
Through overall equipment effectiveness (OEE), which multiplies availability, performance and quality into one figure, and the six big losses behind it: breakdowns, set-up and adjustment, minor stops, reduced speed, defects and rework, and start-up losses. Comparing a line with its own history is more useful than chasing a universal target.
How does digitisation help TPM?
Operator checks become scheduled mobile checklists, abnormalities become tracked actions with owners and due dates, breakdowns and losses are recorded against the asset so patterns are visible, and the results are reviewed on the tier boards that production and maintenance share. The routine runs on a schedule instead of depending on memory.
How does TPM fit with daily management and PDCA?
Implementing total productive maintenance should follow the traditional PDCA approach in order to be effective. To do so, you must ensure the alignment of all of the people, processes and systems involved. That means considering how adjacent processes and systems within our CI framework interact, and ensuring that each element is connected to another.
The lean tools we discuss regularly, like tiered daily management, standardised problem solving techniques, daily huddles and kamishibai boards, should all be developed alongside the elements of a TPM programme.
The illustration below shows how we designed the interconnected TeamAssurance platform to avoid locally optimised, disconnected 'point solutions' (digital or analogue) that do not help and can hinder your organisation's TPM efforts.
If you're a business in need (or a consultant with clients in need) and you'd like to explore how to implement TPM digitally, contact us for a demonstration of the TeamAssurance platform today.
