What are the 8 wastes of lean?

    Short answer

    The eight wastes of lean are the kinds of activity that consume time, money or effort without adding value for the customer: defects, overproduction, waiting, non-utilised talent, transport, inventory, motion and extra processing. The acronym DOWNTIME helps remember them. Seven come from Toyota's original list; non-utilised talent was added later.

    Last updated · TeamAssurance

    The eight wastes (DOWNTIME)

    WasteWhat it looks like
    DefectsScrap, rework, returns, incorrect information
    OverproductionMaking more, sooner or faster than the next process needs
    WaitingPeople or machines idle for parts, approvals, information or the previous step
    Non-utilised talentSkills, ideas and knowledge of people not used
    TransportMoving materials or products further than necessary
    InventoryRaw material, work in progress or finished goods beyond what is needed
    MotionUnnecessary movement by people: walking, reaching, searching
    Extra processingDoing more work or higher quality than the customer values

    Where the list comes from

    Taiichi Ohno described seven wastes (muda) in the Toyota Production System. The eighth, non-utilised talent, was added by Western lean practitioners to make explicit that an organisation which ignores its people's ideas is wasting its most valuable resource.

    How the wastes relate to each other

    Overproduction is often called the worst waste because it creates the others: it builds inventory, hides defects, forces extra transport and motion, and makes people wait for the right part among the wrong ones.

    Finding the wastes

    • Walk the process (a gemba walk) and watch for waiting, searching and moving.
    • Map the value stream and time each step; non-value-adding time is usually most of the lead time.
    • Ask the people doing the work. They know where the waiting and rework are; whether anyone asks is the non-utilised-talent test.
    • Review tier boards. Repeated misses on delivery or quality measures point at specific wastes.

    Waste, overburden and unevenness

    Lean also names two companions of waste: muri (overburden of people or equipment) and mura (unevenness in demand or workload). Removing waste without addressing overburden and unevenness tends to be temporary.

    What to do with a waste once it is found

    Name it, measure it, find its cause and remove the cause. A waste that is only noted becomes part of the scenery; one that goes through structured problem solving and a changed standard stays gone.

    How TeamAssurance helps

    In TeamAssurance, wastes found on the floor are raised as issues or improvement ideas from a phone, land on the team's tier board with an owner and are reviewed in the daily meeting. Repeating causes move into A3 or PDCA problem solving, and the resulting standard is scheduled as a checklist so the fix holds.

    Frequently asked questions

    What does DOWNTIME stand for in lean?

    Defects, Overproduction, Waiting, Non-utilised talent, Transport, Inventory, Motion and Extra processing: the eight wastes in an order that spells a memorable word.

    What were the original 7 wastes?

    Taiichi Ohno's seven: overproduction, waiting, transport, over-processing, inventory, motion and defects. Non-utilised talent is the eighth, added later.

    Which waste is the most serious?

    Most lean teachers name overproduction, because it hides problems and creates the other wastes. In practice the most serious waste is the one costing your operation the most this month.