Key facts
- Purpose: remove waste, delay, defects and safety risk from a defined process.
- Scope: one process at a time, with a clear start, end and owner.
- Common methods: PDCA, DMAIC, kaizen, A3 problem solving and value stream mapping.
- Output: a measured gain and an updated standard work document or SOP.
What are the steps of process improvement?
- Choose the process. Pick one with a measure that matters, such as lead time, scrap or near misses.
- Map the current state. Walk the process with the people who do it and record each step, wait and handover.
- Find the causes. Use data and root cause analysis to see why the problem happens.
- Test a change. Trial a countermeasure on a small scale and compare the result with the baseline.
- Standardise and share. Write the better method into standard work, train the team and copy it to similar areas.
What is lean process improvement?
Lean process improvement is process improvement guided by lean principles: define what the customer values, map the value stream, remove the eight wastes, make work flow and pull. The aim is a lean process with shorter lead times. Lean targets waste and flow; Six Sigma targets variation, and Lean Six Sigma combines both.
Which process improvement method should you use?
| Method | Best for |
|---|---|
| PDCA or kaizen | Small, frequent problems the team can fix within days |
| A3 | Problems that need a structured one-page story and leader coaching over a few weeks |
| DMAIC or Lean Six Sigma | Complex variation problems where data must prove the cause |
| Value stream mapping | Flow problems that cross several departments |
How is process improvement different from continuous improvement?
Process improvement is a single effort aimed at one process. Continuous improvement is the ongoing habit of running those efforts across the whole organisation, every day, so the gains keep adding up. With continuous improvement, the next one is always under way, usually raised in daily tier meetings.
Example
Picture a food packing line that loses around 40 minutes a shift to label jams. The team walks the changeover and finds each shift loads the label rolls differently. They trial a one-page loading standard for two weeks, jams fall sharply, and the standard goes into the line checklist and onto the other packing lines.