Template

    Corrective Actions: Types, Process and Examples

    In short

    Corrective actions are the steps taken to remove the root cause of a problem that has already happened, such as a defect, incident or audit finding, so it does not recur. They range from strong, such as designing the error out, to weak, such as a reminder, and each needs one owner, a due date and a check that it worked.

    Key facts

    • Types by strength: eliminate or design out, engineer or automate, change the standard, then train or remind.
    • Triggers: audit findings, non-conformances, incidents and near misses, customer complaints, repeat breakdowns, supplier failures.
    • Process: contain, find the root cause, choose the action, assign an owner and date, verify the result, share the lesson.
    • Tracking: one log, reviewed on the tier boards, with overdue actions and unverified closures visible every week.

    By Matt Mafrici, CEO and founder, TeamAssurance · Published

    LinkedIn Email

    What are the types of corrective actions?

    Corrective actions are best sorted by how well they stop a repeat, because that is what decides whether the problem comes back. The stronger the action, the less it depends on people remembering.

    StrengthTypeWhat it doesExample
    StrongestEliminate or design outRemoves the chance of the errorChange the part so it can only be fitted one way
    StrongEngineer or automateBuilds a control into the equipment or systemTorque tool that logs each tightening and blocks sign-off without it
    MediumChange the standardUpdates the procedure, checklist, layout or scheduleAdd a tension check to the changeover standard
    WeakTrain or remindRelies on people rememberingRe-brief the shift, toolbox talk, new sign

    Containment, such as quarantining stock or stopping a task, is a correction rather than a corrective action. It protects people and customers today but leaves the cause in place. For safety, the same ranking appears as the hierarchy of control: aim as high as is reasonably practicable and record the level.

    What is the corrective action process?

    The process has six steps, and each one is a place where actions go wrong if it is skipped.

    1. Contain. Protect people and customers now, and check what else is at risk.
    2. Find the root cause. Use 5 whys, a fishbone or data, with the people who run the process, and confirm it with evidence.
    3. Choose the action. One or more actions per cause, as high up the strength table as you can manage.
    4. Assign an owner and a date. One named person per action and a real due date.
    5. Verify the result. Check the agreed measure after enough time or volume has passed, ideally by someone other than the owner.
    6. Standardise and share. Update the procedure or checklist and apply the fix to similar lines and sites.

    The full definition, with the difference between correction, corrective action and preventive action, is on the corrective action glossary page. To record one problem end to end, use the corrective action plan template.

    What are examples of corrective actions?

    SourceProblemWeak actionStronger corrective action
    Audit findingGauges found out of calibrationRemind the team to check datesCalibration due dates scheduled as tasks with an owner and escalation when overdue
    Customer complaintWrong label on a delivered packRe-brief the packing lineLabel scanned against the order before the carton can close
    Safety incidentForklift clips a walkway barrier at a blind cornerNew "slow down" signRe-route the walkway, add a marked crossing and a convex mirror
    Near missGuard left open during cleaningToolbox talk on guardingInterlock that stops the machine when the guard is open
    Repeat breakdownBearing fails every eight weeksReplace the bearing againFix the misalignment and add the check to the maintenance standard
    Supplier failureIncoming resin out of specification twiceReject the loadSupplier corrective action request with their root cause and verified fix
    EnvironmentalRepeated small oil leaks to drainClean up each timeBunding at the transfer point and a leak check on the shift checklist

    How do you write a corrective action?

    Write each action as a specific change, with the owner and date, tied to the cause it addresses.

    WeakBetter
    Operators to be more carefulAdd a go/no-go gauge at station 4 so a short part cannot pass (maintenance supervisor, 20 Nov)
    Retrain the night shiftPut the new setting on the changeover checklist and check it at the 6 am huddle (shift leader, 14 Nov)
    Improve communicationShow open maintenance requests on the Tier 1 board each morning (team leader, 7 Nov)

    An action that matches no listed root cause is a guess. An action with "ASAP" for a date has no date.

    How do you track corrective actions?

    Keep one log for all sources, so a repeat cause is visible across audits, incidents and complaints. A working log needs these columns: number, source and date raised, problem, root cause, action, strength (design out, engineer, standard, train), owner, due date, status, verification date, result and date closed.

    Review it where the work is reviewed. The Tier 1 huddle sees actions due that day, the Tier 2 meeting reviews overdue actions and those waiting for verification, and repeat causes go up to Tier 3 as improvement projects. Three numbers show whether the system works: actions overdue, actions closed without a verification check, and problems that return within 90 days.

    Why do corrective actions fail?

    • Actions are closed when the work is done, not when the result is verified.
    • The root cause is a symptom, or a person.
    • Training is the default action, so the process itself never changes.
    • Standards are not updated, so the old way returns.
    • Actions sit in a spreadsheet that nobody reviews.
    • The lesson stays on one line, so the same cause produces the same problem next door.

    Step by step

    1. Contain the problem. Protect people and customers now and check whether other lines, shifts or sites are at risk.
    2. Find the root cause. Use 5 whys, a fishbone diagram or data with the people who run the process, and confirm the cause with evidence.
    3. Choose the action. Pick one or more actions per cause, as high up the strength ranking as you reasonably can: design out, engineer, change the standard, then train.
    4. Assign an owner and a date. One named person per action and a real due date, with the measure that will show it worked.
    5. Verify the result. Check the measure after enough time or volume has passed, preferably by someone other than the owner.
    6. Standardise and share. Update the procedure or checklist and apply the fix to similar lines and sites before closing.

    A worked example

    A packaging plant logged corrective actions from audits, customer complaints and incidents in three different places, and most were closed by retraining. It moved them into one log reviewed on the tier boards and added a strength column. Over a quarter the team converted eleven training actions into changes to equipment or standards, put every overdue action on the Tuesday Tier 2 agenda, and reopened two actions whose verification checks failed. The wrong-label complaint, raised four times in the previous year, did not return.

    In TeamAssurance

    In TeamAssurance a non-conformance, failed audit check or incident becomes an action with an owner and due date on the tier board, root cause work sits beside it, and the effectiveness check is a dated action so the record is verified before it closes. Reports show open, overdue and repeat corrective actions by area, so the Tier 2 review sees one list rather than three.

    FAQ

    Frequently asked questions

    What are the types of corrective actions?

    By strength: eliminating or designing out the error, engineering or automating a control, changing the standard or checklist, and training or reminding people. The first two work without anyone remembering; the last depends on it. Containment is a correction, not a corrective action.

    What is an example of a corrective action?

    A labeller jams weekly because label tension drifts after changeover. Clearing the jam is a correction. Marking the correct tension setting and adding a tension check to the changeover standard is the corrective action, and the jams stop.

    How long should corrective actions take?

    Containment the same day, the root cause and actions agreed within one to two weeks, and the actions done within 30 to 60 days, with a verification check after that. Anything overdue goes on the Tier 2 agenda.

    What is the difference between corrective actions and CAPA?

    CAPA is the system that manages corrective and preventive actions from identification to verified closure. Corrective actions are the half that responds to problems that have already happened.

    Is retraining a good corrective action?

    Rarely on its own. Training helps when a skill is missing, but if the process lets the error happen, people will repeat it. Pair training with a change to the checklist, layout or equipment.

    About the author

    Matt Mafrici

    CEO and founder, TeamAssurance

    Operations and continuous improvement practitioner; builds daily management systems with manufacturers, miners, food and pharmaceutical producers in Australia and abroad.

    LinkedIn profile · All articles