    In short

    An FMEA template is the worksheet a team fills in to analyse how a process step could fail: the failure mode, its effect and severity, its causes and occurrence, the current controls and detection, a priority, and the actions taken. This template gives the process FMEA columns in order, the three rating scales, and a filled row so the first entry is not the hardest.

    Key facts

    • Scope: process FMEA (PFMEA), one row per failure mode per step; design FMEA uses the same logic on a product.
    • Ratings: severity, occurrence and detection each 1–10; RPN = S × O × D, or the AIAG-VDA action priority table.
    • Team: the people who run the step plus engineering, quality and maintenance; never one engineer alone.
    • Living document: revisit after every real failure, change to the process or new control.

    By Matt Mafrici, CEO and founder, TeamAssurance · Published

    LinkedIn Email

    The template

    StepFunctionFailure modeEffectSCauseOCurrent controlDPriorityActionOwnerDueNew S/O/D

    A filled row

    StepFunctionFailure modeEffectSCauseOCurrent controlDPriorityAction
    Seal cartonForm hermetic sealIncomplete sealLeak; product spoils; recall risk8Seal-bar temperature drifts after clean6Visual check at start of shift7High (RPN 336)Add temperature check to post-clean checklist; alarm on drift

    What do the rating scales mean?

    RatingSeverity (effect)Occurrence (cause)Detection (control)
    1–2No noticeable effectRemote; almost neverCertain to be detected
    3–4Minor annoyance; reworkLow; a few per yearLikely detected
    5–6Degraded performance; customer complaintModerate; monthlyMay be detected
    7–8Loss of function; safety or regulatory issue with warningHigh; weeklyUnlikely detected
    9–10Safety or regulatory failure without warningVery high; dailyNot detected; no control

    Agree the scales for your site before scoring and write them on the template. Consistency matters more than precision.

    How do you prioritise?

    The traditional method multiplies the three ratings into a risk priority number (RPN, 1–1000) and acts on the highest. Its weakness is that a severity of 10 with low occurrence can score below a nuisance that happens often. The AIAG-VDA 2019 handbook replaced RPN with an action priority (AP) table that reads severity first: any row with severity 9–10 and more than remote occurrence is high priority regardless of detection. Whichever you use, act on severity first.

    How do you run an FMEA?

    1. Map the process steps with the people who do them.
    2. For each step, list the ways it could fail. Use the history of defects, breakdowns and near misses.
    3. For each failure mode, list effects, causes and current controls, and rate S, O, D.
    4. Prioritise and define actions that reduce occurrence (prevent the cause) or improve detection (catch it sooner).
    5. Assign owners and dates, do the actions, re-rate.
    6. Revisit after any real failure or process change.

    FMEA and daily management

    The FMEA predicts; the tier board records. Defects, near misses and breakdowns raised at the daily meeting are evidence that an occurrence or detection rating is wrong, and the actions the FMEA generates belong on the same board as everything else, with owners and dates, where they are reviewed until done.

    Step by step

    1. Map the process. List the steps and their functions with the people who run them.
    2. List failure modes. For each step, every way it could go wrong, using defect and breakdown history.
    3. Rate S, O, D. Effects and severity; causes and occurrence; controls and detection, on agreed 1–10 scales.
    4. Prioritise. Severity first, then RPN or the action priority table.
    5. Act and re-rate. Actions with owners and dates to prevent the cause or improve detection; re-rate when done.
    6. Keep it alive. Revisit after every real failure or change to the process.

    A worked example

    A pharmaceutical packaging line ran its first PFMEA on the blister sealing step after two deviations in a quarter. The team of two operators, the line engineer and a QA specialist listed nine failure modes; incomplete seal from temperature drift scored severity 8, occurrence 6, detection 7. The actions were a temperature check added to the post-clean checklist and a drift alarm. Six months later occurrence was re-rated at 2 and detection at 3, and no sealing deviations had been raised.

    In TeamAssurance

    In TeamAssurance the actions from an FMEA are tracked on the team's tier board with owners and due dates, the controls it relies on run as scheduled checklists and layered audits whose results are visible to the daily meeting, and the defects and near misses raised every day are the evidence the team uses to revisit the ratings.

    FAQ

    Frequently asked questions

    What is the difference between DFMEA and PFMEA?

    DFMEA analyses a product design for ways it could fail in use. PFMEA analyses a manufacturing or service process for ways each step could fail. Same columns, different scope.

    Should we use RPN or action priority?

    Action priority (AIAG-VDA) is the current automotive standard and handles high-severity rows better. If you keep RPN, add a rule that any severity 9–10 row is acted on regardless.

    How often should an FMEA be updated?

    After every real failure, every process change and at least annually. An FMEA that has not changed in two years is a filing exercise.

    Who should lead an FMEA?

    A facilitator who knows the method, with the people who run the process doing the thinking. The quality department supports; it does not do it alone.