Key facts
- QA: quality assurance, the planned standards, procedures, training and audits that make a process able to meet requirements.
- QC: quality control, the inspection, measurement and testing of the actual output against its specification.
- Defined in: ISO 9000:2015, which treats both as parts of quality management.
- Where the term is used: manufacturing, construction, engineering, food, pharmaceuticals, laboratories and software.
- How they connect: QC finds the defect, and QA changes the process so it does not come back.
Quality assurance and quality control definitions
ISO 9000:2015, the international quality vocabulary, defines both as parts of quality management. In plain English:
- Quality assurance is the part of quality management that gives confidence the quality requirements will be met. It works on the process, before and during the work.
- Quality control is the part of quality management that makes sure the quality requirements are met. It works on the output, by inspecting, measuring and testing it.
So QA builds confidence in the process, and QC confirms the result.
What does QA stand for?
QA stands for quality assurance and QC stands for quality control; "QA/QC" means the two used together. In software, QA usually means the testing and review done before a release: see software quality assurance.
What is the difference between QA and QC?
QA asks "are we doing the work the right way?" and QC asks "is this output right?".
| Quality assurance (QA) | Quality control (QC) | |
|---|---|---|
| Focus | The process | The product or service |
| Purpose | Prevent defects | Detect defects |
| Timing | Before and during the work | During and after the work |
| Typical activities | Standard work, procedures, training, process audits, supplier approval | Inspection, testing, measurement, sampling |
| Who | Everyone who runs or manages the process | Inspectors, operators doing self-checks, lab |
| Output | A capable, followed process | Accept, reject or rework decisions |
What are examples of quality assurance?
- Written standard work and work instructions for each critical step
- Layered process audits that check the standard is being followed
- Operator training and sign-off before working unsupervised
- Supplier approval and incoming material specifications
- Error-proofing (poka-yoke) so the defect cannot be made
What are examples of quality control?
- First article inspection at the start of a run or after a changeover
- In-process checks against a control plan, often on a control chart
- Final inspection and testing before dispatch
- Laboratory testing of samples against a specification
How do QA and QC work together?
QC produces the evidence; QA acts on it. When an inspection finds a defect, the product is contained and a non-conformance is raised. The repeat pattern is then traced to root cause, the process or standard is corrected, and the change is verified. Without that loop, QC only sorts good from bad and the same defects keep returning. Without QC, QA has no data to show whether the process really works.
What is a QA/QC plan?
A QA/QC plan (often called a quality plan, or an inspection and test plan in construction) is the document that says, for one product, project or process, how quality will be built in and how it will be checked. A workable plan is built in six steps:
- List the requirements. Customer specifications, drawings, standards and legal requirements that the output must meet.
- Find the critical characteristics. The features that matter most to the customer or to safety, often found with an FMEA.
- Set the QA controls. For each critical step, name the standard operating procedure or work instruction, the training needed and any error-proofing.
- Set the QC checks. What is inspected or tested, how, how often, the sample size, the acceptance criteria and who signs it off.
- Define the reaction plan. What happens when a check fails: stop, contain, record a non-conformance and assign an owner.
- Plan the audits and reviews. How often the plan itself is audited, and when results are reviewed by the team and by management.
QA/QC in manufacturing and construction
The idea is the same in every industry, but the documents differ.
| Manufacturing | Construction | |
|---|---|---|
| Main QA document | Control plan, standard work, process audit schedule | Project quality plan, method statements |
| Main QC document | Inspection sheets, control charts, test records | Inspection and test plan (ITP), hold and witness points |
| Typical QC checks | First article, in-process, final inspection | Material tests, concrete and weld tests, pre-pour checks |
| Who signs off | Operator, team leader or quality inspector | Site engineer, QA/QC inspector, client's representative |
In manufacturing the checks repeat every shift on the same line, so trends over time matter (see quality control in manufacturing for the methods). On a construction project most checks happen once per element, so the record that each hold point was inspected before work continued matters most.
A worked example
Picture a food packaging line where customers report under-filled packs. QC first contains the problem: the affected batches are held and checked, and a non-conformance is raised. The team then looks at the filler check data and finds the fill weight drifts after each changeover, because there is no set-up check and the setting is adjusted by feel.
QA fixes the process. A changeover checklist with the correct setting is written into the work instruction, operators are trained and signed off, and a first-pack weight check is added before the line restarts. A layered process audit question confirms the new check is done every shift. QC then keeps measuring fill weight, and the team watches the trend to verify the fix has held.
Common QA/QC mistakes
- Relying on final inspection. Inspection sorts defects but does not stop them being made, and some defects are missed.
- Checks with no reaction plan. A failed check that nobody acts on is just paperwork.
- Procedures nobody follows. A QA system lives in the process, not in the folder; audit what really happens.
- Fixing the product but not the process. Rework clears today's defect; only a corrective action stops the next one.
- Quality kept apart from operations. When quality results are not reviewed where the work is managed, problems wait for the monthly report.
Where QA/QC fits in daily management
The quickest way to close the loop is to put quality on the same board as safety and delivery. Failed checks, first pass yield and open non-conformances are reviewed every shift, and anything that repeats moves into structured problem solving.
Sources
- ISO 9000:2015, Quality management systems: Fundamentals and vocabulary.
- American Society for Quality (ASQ), "Quality Assurance and Quality Control" (asq.org).