What is quality assurance and quality control (QA/QC)?

    Short answer

    Quality assurance (QA) is the planned set of standards, procedures and audits that builds confidence a process will produce work that meets requirements. Quality control (QC) is the inspection and testing of the actual product or service to find defects before they reach the customer. QA is process-focused and preventive; QC is product-focused and detective. A quality system needs both.

    Last updated · TeamAssurance

    Key facts

    • QA: quality assurance, the planned standards, procedures, training and audits that make a process able to meet requirements.
    • QC: quality control, the inspection, measurement and testing of the actual output against its specification.
    • Defined in: ISO 9000:2015, which treats both as parts of quality management.
    • Where the term is used: manufacturing, construction, engineering, food, pharmaceuticals, laboratories and software.
    • How they connect: QC finds the defect, and QA changes the process so it does not come back.

    Quality assurance and quality control definitions

    ISO 9000:2015, the international quality vocabulary, defines both as parts of quality management. In plain English:

    • Quality assurance is the part of quality management that gives confidence the quality requirements will be met. It works on the process, before and during the work.
    • Quality control is the part of quality management that makes sure the quality requirements are met. It works on the output, by inspecting, measuring and testing it.

    So QA builds confidence in the process, and QC confirms the result.

    What does QA stand for?

    QA stands for quality assurance and QC stands for quality control; "QA/QC" means the two used together. In software, QA usually means the testing and review done before a release: see software quality assurance.

    What is the difference between QA and QC?

    QA asks "are we doing the work the right way?" and QC asks "is this output right?".

    Quality assurance (QA)Quality control (QC)
    FocusThe processThe product or service
    PurposePrevent defectsDetect defects
    TimingBefore and during the workDuring and after the work
    Typical activitiesStandard work, procedures, training, process audits, supplier approvalInspection, testing, measurement, sampling
    WhoEveryone who runs or manages the processInspectors, operators doing self-checks, lab
    OutputA capable, followed processAccept, reject or rework decisions

    What are examples of quality assurance?

    • Written standard work and work instructions for each critical step
    • Layered process audits that check the standard is being followed
    • Operator training and sign-off before working unsupervised
    • Supplier approval and incoming material specifications
    • Error-proofing (poka-yoke) so the defect cannot be made

    What are examples of quality control?

    • First article inspection at the start of a run or after a changeover
    • In-process checks against a control plan, often on a control chart
    • Final inspection and testing before dispatch
    • Laboratory testing of samples against a specification

    How do QA and QC work together?

    QC produces the evidence; QA acts on it. When an inspection finds a defect, the product is contained and a non-conformance is raised. The repeat pattern is then traced to root cause, the process or standard is corrected, and the change is verified. Without that loop, QC only sorts good from bad and the same defects keep returning. Without QC, QA has no data to show whether the process really works.

    What is a QA/QC plan?

    A QA/QC plan (often called a quality plan, or an inspection and test plan in construction) is the document that says, for one product, project or process, how quality will be built in and how it will be checked. A workable plan is built in six steps:

    1. List the requirements. Customer specifications, drawings, standards and legal requirements that the output must meet.
    2. Find the critical characteristics. The features that matter most to the customer or to safety, often found with an FMEA.
    3. Set the QA controls. For each critical step, name the standard operating procedure or work instruction, the training needed and any error-proofing.
    4. Set the QC checks. What is inspected or tested, how, how often, the sample size, the acceptance criteria and who signs it off.
    5. Define the reaction plan. What happens when a check fails: stop, contain, record a non-conformance and assign an owner.
    6. Plan the audits and reviews. How often the plan itself is audited, and when results are reviewed by the team and by management.

    QA/QC in manufacturing and construction

    The idea is the same in every industry, but the documents differ.

    ManufacturingConstruction
    Main QA documentControl plan, standard work, process audit scheduleProject quality plan, method statements
    Main QC documentInspection sheets, control charts, test recordsInspection and test plan (ITP), hold and witness points
    Typical QC checksFirst article, in-process, final inspectionMaterial tests, concrete and weld tests, pre-pour checks
    Who signs offOperator, team leader or quality inspectorSite engineer, QA/QC inspector, client's representative

    In manufacturing the checks repeat every shift on the same line, so trends over time matter (see quality control in manufacturing for the methods). On a construction project most checks happen once per element, so the record that each hold point was inspected before work continued matters most.

    A worked example

    Picture a food packaging line where customers report under-filled packs. QC first contains the problem: the affected batches are held and checked, and a non-conformance is raised. The team then looks at the filler check data and finds the fill weight drifts after each changeover, because there is no set-up check and the setting is adjusted by feel.

    QA fixes the process. A changeover checklist with the correct setting is written into the work instruction, operators are trained and signed off, and a first-pack weight check is added before the line restarts. A layered process audit question confirms the new check is done every shift. QC then keeps measuring fill weight, and the team watches the trend to verify the fix has held.

    Common QA/QC mistakes

    • Relying on final inspection. Inspection sorts defects but does not stop them being made, and some defects are missed.
    • Checks with no reaction plan. A failed check that nobody acts on is just paperwork.
    • Procedures nobody follows. A QA system lives in the process, not in the folder; audit what really happens.
    • Fixing the product but not the process. Rework clears today's defect; only a corrective action stops the next one.
    • Quality kept apart from operations. When quality results are not reviewed where the work is managed, problems wait for the monthly report.

    Where QA/QC fits in daily management

    The quickest way to close the loop is to put quality on the same board as safety and delivery. Failed checks, first pass yield and open non-conformances are reviewed every shift, and anything that repeats moves into structured problem solving.

    Sources

    • ISO 9000:2015, Quality management systems: Fundamentals and vocabulary.
    • American Society for Quality (ASQ), "Quality Assurance and Quality Control" (asq.org).

    How TeamAssurance helps

    In TeamAssurance, QA routines such as layered process audits and standard checklists are scheduled to the right people, QC checks are completed on a phone or tablet, and every failed check becomes an owned action. Non-conformances move through root cause analysis and CAPA, and quality measures sit on the tier board beside safety, delivery and cost.

    Frequently asked questions

    Quality control vs quality assurance: which comes first, and which matters more?

    Quality assurance comes first: the procedures, training and checks are planned before the work starts. Quality control happens during and after the work, checking the actual output against its specification. So in quality control vs quality assurance, QA is the preventive step and QC the detective one. Neither replaces the other: QA prevents most defects, and QC catches what still gets through and supplies the data that shows whether QA is working.

    What does a QA/QC manager do?

    A QA/QC manager owns the quality plan: setting inspection and test requirements, running audits, managing non-conformances and corrective actions, and reporting quality performance. The role is common in construction, engineering and manufacturing.

    What is the quality control and quality assurance definition?

    Under ISO 9000, quality assurance (QA) is the part of quality management that gives confidence quality requirements will be met, through planned standards, procedures, training and audits. Quality control (QC) is the part that makes sure they are met, by inspecting and testing the actual output. QA stands for quality assurance and QC for quality control.

    Is quality control part of quality assurance?

    In ISO 9000 both are parts of quality management, alongside quality planning and quality improvement. In practice many companies run QC inside a wider QA system, which is why the two are often written together as QA/QC.

    What is an inspection and test plan (ITP)?

    An ITP lists every inspection and test for a job, the standard or criteria for each, how often it is done, who does it, and the hold or witness points where work must stop until the check is signed off. It is the main QC document on construction and engineering projects.

    What is the difference between quality control and quality management?

    Quality control is one part of quality management. Quality management also covers quality planning, quality assurance and quality improvement, usually organised as a quality management system such as one built to ISO 9001.