A control chart (process behaviour chart) plots a measure over time with its average and upper and lower control limits calculated from the process's own variation, so you can tell the difference between normal fluctuation and a real change. It stops teams reacting to noise and shows when an improvement has genuinely shifted the process.
At a glance
- What it is: a chart that plots a measure over time with its average and upper and lower control limits.
- Control limits: usually three standard deviations above and below the average, calculated from the process's own history.
- Four states: the ideal, the threshold, the brink of chaos and the state of chaos.
- Related: what is a Pareto chart? and what are manufacturing KPIs?.
Lean, at its core, is about a deep respect for humanity and about visualising what is occurring in any given process. This allows us to expose waste and identify opportunities for improvement.
What is a control chart?
One significant tool in the Lean arsenal is the control chart (or process behaviour chart). This is sometimes referred to as the Shewhart chart, or a Statistical Process Control (SPC) Chart.
Points inside the limits are normal variation; a point outside them is a signal to investigate.
It is one of several visual tools typically applied to quality control analysis. The chart enables us to understand how a process behaves and changes over time. Invented by Walter A Shewhart in the 1920s, control charts are used in numerous industries as part of continuous improvement methodologies.
Shewhart understood that no matter how well a process is designed there will always be variation within that process. SPC is an effective technique for variation monitoring and control.
How is a process behaviour chart similar to a run chart?
A process behaviour chart is similar in many respects to the conventional run chart; it's really just an extension to it. A run chart plots observed values on the y-axis and the times they were observed on the x-axis. Run charts are similar to process behaviour charts but do not show the control limits of the process.
How do you interpret control chart data?
When a process is stable and in control it displays natural variation - variation that is inherent in the process. A process is deemed to be in control when based on history it can be reliably predicted how the process will behave within limits moving forward.
Walter Shewhart made a critical distinction between the types of variation. Some variation is natural or routine, while other variation is exceptional and can be seen as a signal of a change happening in the process.
What are the four states of a process?
Processes fall into one of four states:
The Ideal
The process is in statistical control and produces 100% conformance to customer expectations.
The Threshold
The process is in statistical control but still produces occasional non-conformance.
The Brink of Chaos
The process is not in statistical control but is not producing defects. It relies on good luck rather than good design.
The State of Chaos
The process is not in statistical control and produces unpredictable levels of non-conformance.
Every process will fall into one of these states at any given time. All processes will move toward the state of chaos over time.
What makes a process behaviour chart different?
A process behaviour chart creates a central line around the average of the data points. Where it differs from a run chart is that it adds upper and lower control limits (UCL and LCL). The control limits represent the normal distribution of data and signal exceptional variation when data points fall outside of them.
Frequently asked questions about control charts
What are control limits?
Lines, usually three standard deviations above and below the average, calculated from the process's historical variation. Points inside the limits are the process behaving normally; points outside, or unusual runs, signal that something has changed and is worth investigating.
How is a control chart used in continuous improvement?
Plot the measure before the change to see its normal behaviour, make the change, and watch whether the points shift beyond the old limits. A real improvement moves the average or narrows the limits; reacting to single points inside the limits is tampering.
Can a control chart be used on a tier board?
Yes, and it is one of the most useful charts to put there: the team sees at a glance whether today's number is just variation or a signal, which changes the conversation from explaining every point to acting on real changes.
How do control charts fit the wider framework?
When developing processes we must consider how they fit into the greater continuous improvement framework. The interconnection of Lean tools like standardised problem solving techniques, Standard Operating Procedures (SOPs), and a Tiered Daily Management process that supports the entire PDCA loop is critical.
If you're a business in need (or a consultant with clients in need) and you'd like to explore the opportunities that digital-aids to Lean tools provide contact us for a demonstration of the TeamAssurance platform today.