    A prioritisation matrix template gives a team a repeatable way to rank options against agreed criteria. This page has two: the impact-effort grid, a two-by-two for sorting a short list quickly, and the weighted matrix, a table in which each option is scored on several weighted criteria and ranked by total. Use the first weekly and the second for the year's projects.

    Key facts

    • Impact-effort grid: four quadrants, ten minutes, sticky notes; best for the week's problems.
    • Weighted matrix: three to six criteria, weights out of 10, scores of 1/3/9, ranked by total.
    • Inputs: the list of problems or ideas from tier boards, a Pareto of recent issues, the strategic goals.
    • Output: a ranked list reviewed at Tier 2 monthly, with the top items turned into projects with owners.

    By Matt Mafrici, CEO and founder, TeamAssurance · Published

    LinkedIn Email

    Template 1: the impact-effort grid

    Low effortHigh effort
    High impactDo first — quick wins, this weekPlan — projects with an owner and a date
    Low impactFill in — when time allowsDrop — or redesign to reduce effort

    Write each option on a note, place it, then read the top-left quadrant into the action list. Argue about placement, not about the grid.

    Template 2: the weighted prioritisation matrix

    OptionSafety (w=10)Customer (w=8)Cost saving (w=6)Ease (w=4)Time to result (w=4)Total
    Option A
    Option B
    Option C
    Option D

    Score each cell 1 (weak), 3 (moderate) or 9 (strong). Multiply by the weight, sum across the row, rank by total. Change the criteria and weights to your site's priorities before you start, and do not change them during scoring.

    How do you run a prioritisation session?

    1. Bring the list: problems from the tier boards, ideas from the floor, a Pareto of the last quarter's issues.
    2. Agree the criteria and weights first, with the leader who owns the resources in the room.
    3. Score together, out loud, one option at a time. Disagreement is information; record it.
    4. Rank and sense-check. A surprising result means a weight is wrong or the option is misunderstood.
    5. Turn the top three to five into projects with owners and dates. Park the rest with a review date.

    What are the common mistakes?

    • Scoring alone and presenting the ranking, which produces an argument about the ranking rather than about the options.
    • Too many criteria, so everything scores the same.
    • Overriding the result quietly, which teaches the team that scoring is theatre.
    • Never re-running it, so last year's priorities crowd out this month's red measure.

    Prioritisation and daily management

    The tier boards generate more problems than any team can work on. The Tier 2 meeting uses the matrix monthly to choose which become projects, the chosen projects appear on the board beside the measures they should move, and the matrix is re-run when a measure turns red that was not on the list.

    Step by step

    1. Collect the options. Problems, ideas and projects from the boards and the Pareto of recent issues.
    2. Agree the criteria and weights. Three to six criteria that reflect the site's goals; weights fixed before scoring.
    3. Score together. 1, 3 or 9 per cell, out loud, one option at a time.
    4. Rank and sense-check. Sort by total; question surprises before accepting them.
    5. Convert the top items. Projects with owners and dates on the Tier 2 board; park the rest with a review date.

    A worked example

    A pharmaceutical packaging site had 23 improvement ideas and capacity for four projects. The Tier 2 team weighted deviation reduction at 10, line efficiency at 8, cost at 6 and ease at 4, then scored all 23 in a ninety-minute session. Two ideas that had been pushed by a senior manager scored low on every criterion and were parked without argument because the scoring was visible. The top four became A3 projects reviewed every Thursday.

    In TeamAssurance

    In TeamAssurance, ideas and problems raised on tier boards and in issue reports are collected in one list, the ones chosen become improvement projects with owners and PDCA stages, and those projects sit on the Tier 2 and Tier 3 boards beside the measures they are meant to move, so the prioritisation is visible in the same meeting that reviews the results.

    FAQ

    Frequently asked questions

    Which template should we use?

    The impact-effort grid for short lists and weekly decisions; the weighted matrix when the decision commits weeks of people's time or the options are contested.

    Why score 1, 3, 9 rather than 1 to 5?

    The wider spread separates options more clearly and stops everything clustering around the middle.

    Who should be in the room?

    The people who will do the work and the leader who controls their time. Scoring together is what makes the result stick.

    How often should we re-prioritise?

    Monthly at Tier 2, and whenever a measure turns red that is not covered by the current projects.