Template

    A3 Report Template

    In short

    An A3 report template is a single page, originally A3 paper, laid out in seven sections that walk a team through a problem: background, current condition, target condition, root cause analysis, countermeasures, implementation plan and follow-up. The left side describes the problem; the right side describes the response. This template gives the sections, the prompts and the order.

    Key facts

    • Origin: Toyota, where a single sheet of A3 paper (297 × 420 mm) carried the whole problem-solving story.
    • Use: problems that take days to weeks and need a cross-functional view; daily problems use a simpler PDCA.
    • Flow: left side (sections 1–4) is the problem; right side (sections 5–7) is the response. Do not start on the right.
    • Output: one page a coach can read in five minutes, reviewed at Tier 2 or Tier 3 until follow-up is complete.

    By Matt Mafrici, CEO and founder, TeamAssurance · Published

    LinkedIn Email

    What are the seven sections of an A3?

    #SectionWhat goes in it
    1BackgroundWhy this problem matters now: the business context, the measure affected, who is impacted. Three sentences.
    2Current conditionWhat is actually happening, with data: a chart, a Pareto, a sketch of the process. Facts from the gemba, not opinions.
    3Goal / target conditionThe measurable state you want by when. "Reduce label jams from 14 a week to 2 by 30 June."
    4Root cause analysisThe gap between 2 and 3 broken down: fishbone, 5 whys, data by cause. End with the root causes you will act on.
    5CountermeasuresThe actions that address each root cause, with the expected effect. Several small ones beat one large one.
    6Implementation planWho does what by when: a table of action, owner, date, status.
    7Follow-upHow and when you will check the result against the goal, and what you will standardise or share if it works.

    Across the top: title (the problem, not the solution), owner, coach, date and version.

    The template

    Left side: the problemRight side: the response
    1. Background — Why now? Which measure? Who is affected?5. Countermeasures — Root cause → countermeasure → expected effect
    2. Current condition — Data, chart, process sketch6. Implementation plan — Action / owner / due / status
    3. Target condition — Measure, value, date7. Follow-up — Check date, method, result, standardise / share
    4. Analysis — Fishbone or 5 whys → root causes

    How do you fill in an A3?

    Fill it left to right and expect to rewrite the left side at least twice. The first current condition is usually an opinion; go back to the floor and replace it with data. Do not write countermeasures until the coach agrees the analysis reaches a cause. Hand-drawn is fine; the point is the thinking, not the formatting.

    What makes a bad A3?

    • Solution in the title ("Install new labeller").
    • Current condition with no numbers.
    • Analysis that stops at a symptom ("operator error").
    • Countermeasures that do not match the root causes listed.
    • No follow-up date, so nobody knows if it worked.

    A3 reports and the daily management system

    An A3 is raised when a measure on the tier board stays red despite daily actions. It is reviewed at the Tier 2 meeting on a fixed day, its actions are the same actions the board tracks, and section 7 closes when the measure has held for a period the team agrees. Completed A3s are kept where other teams can read them, which is how yokoten (sharing) happens.

    Step by step

    1. Write the background. State why the problem matters, which measure it affects and who feels it, in three sentences.
    2. Go and see the current condition. Collect data at the gemba: how often, where, when, how much. Draw it.
    3. Set the target. A measurable value by a date, agreed with the coach and the process owner.
    4. Analyse to root cause. Fishbone to organise causes, 5 whys to go deep, data to confirm which causes matter.
    5. Choose countermeasures. One per confirmed root cause, with the expected effect on the measure.
    6. Plan and do. Action, owner, date, status. Review weekly until done.
    7. Follow up and standardise. Check the measure on the agreed date; update the standard and share the A3 if it held.

    A worked example

    A beverage line raised an A3 after label jams stayed red for three weeks. The first current condition said 'frequent jams'; the coach sent the owner back, and the second version showed 14 jams a week, 11 of them on one SKU after changeover. The fishbone pointed to label tension being set by eye. The countermeasure was a marked setting and a checklist step; the follow-up four weeks later showed two jams a week, and the changeover standard was updated across both shifts.

    In TeamAssurance

    In TeamAssurance an A3 is an improvement project raised from a red measure on the tier board, with the seven sections, the actions and the evidence recorded against it. The actions appear on the owners' boards, the project is reviewed in the Tier 2 meeting, and when it closes the updated standard is pushed to the checklists the teams run every day.

    FAQ

    Frequently asked questions

    Why is it called an A3?

    Because the whole story had to fit on one sheet of A3 paper. The constraint forces clear thinking; the paper size is not the point.

    What is the difference between an A3 and PDCA?

    PDCA is the cycle; the A3 is the one-page format that tells the story of one PDCA cycle. Sections 1–4 are Plan, 5–6 are Do, 7 is Check and Act.

    How long should an A3 take?

    Two to eight weeks for most operational problems. Longer than that usually means the scope is too big; split it.

    Who owns an A3?

    One person close to the problem, with a coach who asks questions rather than giving answers. The owner is not necessarily the most senior person involved.

    Can an A3 be digital?

    Yes, as long as the discipline of one page, left-to-right flow and coaching reviews is kept. Digital A3s make sharing and follow-up easier.

    About the author

    Matt Mafrici

    CEO and founder, TeamAssurance

    Operations and continuous improvement practitioner; builds daily management systems with manufacturers, miners, food and pharmaceutical producers in Australia and abroad.

    LinkedIn profile · All articles