    RACI Matrix Template and Example

    In short

    A RACI matrix, shown here as a RACI example or sample RACI chart, is a table with tasks down the left and roles across the top, where each cell holds R (responsible), A (accountable), C (consulted) or I (informed). This page gives a blank template, three filled RACI examples, for a non-conformance, a project and a machine breakdown, and four checks for every row.

    Key facts

    • Rule 1: exactly one A per row. Two accountable people means nobody is.
    • Rule 2: at least one R per row, or the task has no one doing it.
    • Rule 3: use roles, not names, so the chart survives staff changes.
    • Rule 4: review it when the process changes or a task keeps falling between functions.

    By Matt Mafrici, CEO and founder, TeamAssurance · Published · Updated

    LinkedIn Email
    Each task has exactly one accountable person (A).

    What is a RACI matrix?

    A RACI matrix is a responsibility assignment matrix: a grid that names, for each task or decision, who is Responsible, Accountable, Consulted and Informed. "RACI matrix" and "RACI chart" mean the same thing. Its job is to stop work falling between functions, because every row must end up with one owner (A) and at least one doer (R). For the full definition and where the method comes from, see what is a RACI matrix; this page is the working template.

    The blank template

    Task / decisionRole 1Role 2Role 3Role 4Role 5
    Task 1
    Task 2
    Task 3
    Task 4
    Task 5
    Task 6

    R = Responsible (does the work) · A = Accountable (owns the outcome; one per row) · C = Consulted (input before) · I = Informed (told after)

    Sample RACI chart 1: closing a quality non-conformance

    TaskOperatorSupervisorQuality managerMaintenance plannerSite manager
    Raise the non-conformanceRIA
    Contain the affected productRACI
    Root cause analysisCRAC
    Implement the corrective actionRACR
    Verify the fix heldRAI
    Close and update the standardIRAII

    Sample RACI chart 2: a small improvement project

    TaskProject sponsorProject leadProcess ownerTeam memberFinance
    Agree scope and goalARCI
    Map the current processIARR
    Choose and trial the changeCARRC
    Approve the spendARIC
    Roll out and update the standardIARR
    Review results after 30 daysARCCI

    Notice that every row still has exactly one A. The sponsor holds it for the decisions only they can make, and the lead holds it for the delivery.

    RACI example for an operations task: a machine breakdown

    This RACI example covers an unplanned stop on a production line, from the moment the machine goes down to the update of the maintenance plan.

    TaskOperatorSupervisorMaintenance technicianMaintenance plannerProduction manager
    Stop the machine and make it safeRAI
    Log the breakdown and call maintenanceRAII
    Diagnose and repair the faultCIRA
    Decide whether to reschedule productionRCCA
    Test and hand the machine backCARI
    Record the cause and update the maintenance planCRAI

    Read the third row as a sentence: the technician repairs the fault (R), the planner answers for the repair being done properly (A), the operator is asked what they saw before the stop (C) and the supervisor is told when it is fixed (I). If you cannot read a row aloud like that, the row is not finished.

    How do you build a RACI matrix?

    1. List the tasks or decisions, in the order they happen, down the left.
    2. List the roles across the top. Five to eight is usual; more than ten means the process should be split.
    3. Fill each cell. Blank is allowed and often right.
    4. Check each row: one A, at least one R, Cs only where their input genuinely changes the outcome.
    5. Check each column: a role that is A on every row is a bottleneck; a role with nothing but I may not need to be on the chart.
    6. Agree it with the people in the roles. A RACI nobody has seen is a wish.

    What are the common mistakes?

    • Naming people rather than roles.
    • Making the senior person A for everything.
    • Consulting everyone, so decisions wait for the slowest reply.
    • Filing it after the kickoff and never looking again.

    RACI and daily management

    A RACI tells you who should own each type of action; the tier board shows whether they do. When an action type keeps being reassigned or overdue, the RACI is where the fix is made: give it a clear R and A and put it back on the board.

    Step by step

    1. List the tasks. Every step and decision in the process, in order, one per row.
    2. List the roles. Across the top, as roles not names, five to eight of them.
    3. Assign R, A, C, I. Fill the cells; leave blanks where a role has no part.
    4. Check rows and columns. One A per row, at least one R, no bottleneck columns.
    5. Agree and publish. Walk it through with the people named, then put it where the work happens.

    A worked example

    A food plant kept missing CAPA closure dates. Their RACI for non-conformances showed the quality manager as A and R for every row, including implementing fixes on equipment the maintenance team controlled. Rewriting it made the supervisor R for implementation, the maintenance planner R for equipment changes and the quality manager A for verification and closure only. Overdue CAPAs fell within two months because each action on the board now had an owner who could actually do it.

    In TeamAssurance

    In TeamAssurance every action, audit, project and escalation has one owner and a due date, so the R in your RACI is the person the action is assigned to and the A is the meeting leader who reviews it. Reports by owner and area show where accountability is unclear, which is the signal to revisit the matrix.

    FAQ

    Frequently asked questions

    What does a sample RACI chart look like?

    It is a grid with tasks down the side and roles across the top. Each cell holds R, A, C or I, and each row has exactly one A. The filled sample RACI charts on this page, for a non-conformance, a project and a machine breakdown, show it in practice.

    What is a simple RACI example?

    Take a machine breakdown. The operator stops the machine and logs the fault (R), the supervisor answers for the area being safe (A), the maintenance technician repairs it (R) and the production manager is told (I). Each task has one A and at least one R.

    Can one person be both R and A?

    Yes, on a small task. Write it as A/R. On larger tasks separate them so someone checks the work.

    Is a RACI matrix the same as a RACI chart?

    Yes. RACI matrix, RACI chart and responsibility assignment matrix are names for the same grid of tasks against roles. Some teams say chart for a one-off project and matrix for a standing process, but the rules are the same.

    What is the difference between RACI and RASCI?

    RASCI adds S for Supportive: people who provide resources or help the R without owning the task.

    Should a RACI matrix use names or roles?

    Roles. Add a separate list of who currently holds each role so the chart outlives staff changes.