Throughput is set by one step
Throughput is the rate at which a process produces finished, good units. However fast the other steps run, output cannot exceed the capacity of the slowest one. Improving anything else first usually builds stock in front of the bottleneck and leaves output unchanged.
How to do it, step by step
- Find the bottleneck. Look for the step with the biggest queue in front of it and idle steps after it, or compare each step's cycle time with the takt time.
- Stop losing bottleneck time. Cover breaks, meetings and shift changes so it never stands idle, and keep a buffer of work in front of it.
- Cut its downtime. Put the bottleneck first in line for preventive maintenance and operator checks.
- Shorten its changeovers. Prepare tools and materials before the stop and standardise the steps. See SMED.
- Feed it only good work. Inspect before the bottleneck so it never spends time on parts that will be scrapped later.
- Offload work. Move tasks that do not need the bottleneck to other stations, and balance the line.
- Limit work in progress. Release work at the pace of the bottleneck so other steps do not overproduce. Lower work in progress also shortens lead time.
- Measure and repeat. Track good units per hour daily. When the bottleneck moves, start again at step 1.
Throughput, cycle time and lead time
| Measure | Question it answers |
|---|---|
| Throughput | How many good units per hour or shift? |
| Cycle time | How long does one step take per unit? |
| Lead time | How long does one order take from start to finish? |
Common mistakes
- Buying capacity for a step that is not the constraint.
- Measuring total output rather than good output.
- Letting the bottleneck stop for breaks or paperwork.