Start with the losses, not the budget lines
Across-the-board cuts to training, maintenance or materials often raise costs later through breakdowns and defects. Lasting savings come from removing waste: work and materials the customer does not pay for.
Where manufacturing money usually goes
| Loss | What it costs | Where to look |
|---|---|---|
| Scrap and rework | Materials, labour and capacity used twice | Defect counts by process step |
| Unplanned downtime | Idle people and lost output | Stoppage logs and OEE losses |
| Long changeovers | Capacity lost between products | Changeover times by line |
| Excess stock | Cash tied up, space, damage, obsolescence | Inventory days and slow-moving items |
| Waiting and motion | Paid time that adds no value | Gemba observation and process maps |
How to do it, step by step
- Measure the losses. Put a rough cost on each of the losses above for one month. Estimates are fine at first.
- Rank them. A Pareto chart shows the two or three losses worth attacking first.
- See the process. Walk the floor and map the flow with value stream mapping to find the 8 wastes.
- Fix causes, not symptoms. Use root cause analysis on scrap, preventive maintenance on breakdowns and SMED on changeovers.
- Involve the people doing the work. Operators see waste every shift. A short daily meeting gives them a place to raise it.
- Standardise the improvement. Update the standard work so the saving does not depend on one person remembering.
- Track it daily. Keep scrap, downtime and stock on the team board so a slip is seen within a day.
Common mistakes
- Cutting preventive maintenance or training to hit a monthly number.
- Chasing lower supplier quotes while ignoring scrap and downtime.
- Counting a saving before checking it held for several weeks.